Six weeks for a fifteen-minute delivery
Posted: 27-Nov-2026 |
Recently I had the pleasure of meeting with one of our long-standing members, a highly-professional transport operator specializing in truck-mounted crane deliveries, or HIABs to those in the industry. One of the challenges their business is facing was a text-book example of how mis-directed regulation hurts business, while doing nothing to improve safety.
Despite the sluggish economy, they told me they were having to turn down delivering large items to residences because the delivery address didn’t have off-road sites to unload. They could not deliver the load compliantly.
With urban density in-fill housing well and truly underway in Auckland, that is a significant number of deliveries.
Delivering something like a spa pool should be the simplest job in the book. Right now in Auckland, it can take six weeks.
Here is why. When a property has no suitable driveway access, the crane’s outrigger stabilisers must sit on the footpath for the length of the lift. That brief obstruction triggers the full weight of road corridor rules: a corridor access request, a temporary traffic management plan, and qualified traffic managers on site. These approvals take anywhere from two to six weeks and costs $2,000 to $4,000 in compliance. The customer wanted their spa pool this week.
That is a sledgehammer to crack a nut.
None of these rules were written with bad intent, but we all know the saying about the road being paved with good intentions. Corridor bylaws exist to protect the road and what lies beneath it, the power cables, fibre and water pipes that keep our towns running. Temporary traffic management exists to keep workers and the public safe. Both are good aims. The trouble starts when they are layered on top of each other and applied to a job they were never designed for. In Auckland’s bylaw, the crane rule sits under construction works, alongside excavation, concrete mixers and blasting. A crane resting its feet on a footpath for a quarter of an hour is not a construction site. Our rules treat it as one.
This is health and safety overreach, with consequences nobody intended. Compliant operators turn the work down. Less careful operators take it on and skip the paperwork, so the delivery ends up less safe, not more. Building projects slow down and cost more. Customers lose patience.
What frustrates me most is that this was foreseeable. When the bylaw was consulted on, the road freight industry made submissions flagging exactly this problem. They were ignored.
The example is from Auckland, but the problem is not. Every council manages its road corridor, and every regional operator delivering a water tank, a garden shed or a load of roofing iron to a tight section will recognise it.
There is good news. The national guide to temporary traffic management has moved from a one-size-fits-all code to a risk-based approach. That is the right call. A short lift on a quiet street is low risk, and the national guide allows it to be treated that way. Council processes just need to catch up.
The answer is pragmatic. Let certified operators, trained and accountable, carry out short deliveries like this under a standing approval, rather than weeks of paperwork for every job. The same bylaw already lets a farmer hold an approval to move stock along the road on a regular basis. A fifteen-minute delivery deserves the same common sense.
At NRC, we are building the case to take to councils, starting in Auckland. If this has happened to your business, tell us. Real jobs, real costs and real delays are what will change the rules.
Good rules protect people. Rules that are not fit for purpose simply push the risk somewhere else.
Justin